Complete
Status
07-2012 - 06-2015
Time frame
Business
Segment

One of our main care projects is the construction of the top-clinical ‘Medisch Spectrum Twente’, which is equipped with high-end technologies. Key to the construction of this hospital is the design based on the Healing Environment principles, which creates a climate that is as liveable as possible for the patient. This is beneficial to the recovery process.

In 2012, a start was made with the construction. Completion is planned for mid 2015. What is special, is that only single rooms (340) are built for long-term admissions. The new hospital will have 520 beds.



  • Location Enschede
  • ClientMedisch Spectrum Twente Enschede